为了减少先拧与后拧的高强度螺栓预拉力的差别,其拧紧必须分为初拧和终拧两步进行,对于大型节点,螺栓数量较多,则需要增加一道复拧工序,复拧扭矩仍等于初拧的扭矩,以保证螺栓均达到初拧值。
In order to reduce the difference between the pre tension of high-strength bolts that are tightened first and then, the tightening must be carried out in two steps: initial tightening and final tightening. For large nodes with a large number of bolts, a re tightening process needs to be added. The re tightening torque is still equal to the torque of initial tightening, so as to ensure that all bolts reach the initial tightening value.
《钢结构施工质量验收规范》GB50205-2001要求在高强螺栓初拧后,24小时内进行终拧。在终拧后的1小时后,48小时内要对其进行检测验收。(做检测记录)多用“回旋法”。
Code for Acceptance of Construction Quality of Steel Structures (GB50205-2001) requires final tightening of high-strength bolts within 24 hours after initial tightening. After 1 hour of final tightening, it shall be inspected and accepted within 48 hours. (Make inspection records) Use the "convolution method".
以上就是为大家介绍的有关
扭剪扳手的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务
The above is a detailed introduction to the torque shear wrench. I hope it will be helpful to you. If you have any questions, please contact us. We will provide you with professional services